EasyManua.ls Logo

HPE OfficeConnect 1950 12XGT 4SFP+ - Page 48

HPE OfficeConnect 1950 12XGT 4SFP+
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44
M
management Ethernet
port, 30
port LED, 34
master switch
configuring IRF basic settings, 24
IRF fabric, 21
member
configuring IRF member switch basic settings,
24
connecting IRF physical ports, 24
identifying IRF member switch physical ports,
23
IRF member ID, 21
mounting
workbench mounting switch, 7
N
network management
setting up IRF fabric, 20
troubleshooting configuration terminal
problems, 26
networking
planning IRF cabling scheme, 23
no display (troubleshooting), 26
P
parity (parameter), 16
PC
troubleshooting garbled terminal display, 27
troubleshooting no display, 26
physical port
connecting, 24
identifying IRF member switch physical ports,
23
planning
IRF cabling scheme, 23, 23
IRF connections, 22
IRF member IDs, 21
IRF topology, 22
port
connecting IRF physical ports, 24
identifying IRF member switch physical ports,
23
LED (SFP+), 35
setting up IRF fabric, 20
SFP+, 31
technical specifications, 30
power module
cable, 10
connecting AC power cord, 10
connecting DC power cord, 11
failure (troubleshooting), 25
grounding switch through AC power cord, 9
powering on switch, 16
preparing for installation, 1
preventing
EMI prevention, 2
procedure
configuring IRF basic settings, 24
connecting AC power cord, 10
connecting DC power cord, 11
connecting grounding cable to chassis, 8
connecting grounding cable to grounding strip, 8
connecting IRF physical ports, 24
connecting power cord, 10
grounding switch through AC power cord, 9
grounding switch with a grounding conductor
buried in the earth ground, 9
grounding switch with grounding strip, 8
grounding the switch, 7
identifying IRF master switch, 21
identifying IRF member switch physical ports, 23
installing switch, 1, 4
installing switch in 19-inch rack, 4
mounting switch on workbench, 7
planning IRF connections, 22
planning IRF fabric installation site, 21
planning IRF member IDs, 21
planning IRF topology, 22
setting up IRF fabric, 20
troubleshooting fan failure, 26
troubleshooting fixed power module failure, 25
troubleshooting garbled display, 27
troubleshooting no display, 26
troubleshooting power module failure, 25
Q
quick set-up CLI login
requirements, 13
R
rack
mounting switch to workbench, 7
switch installation in 19-inch rack, 4
verifying switch installation, 12
RPS status LED, 34
S
safety
EMI prevention, 2
grounding switch through AC power cord, 9
grounding the switch, 7

Table of Contents

Related product manuals