MF877-00 Page 3
Template Revision C, 30-July-2018
Copyright 2018 Hewlett Packard Enterprise Development LP
HPE instructions for this template are available at MF877-01
23. Disconnect the mega cell cable from the system board, lift the mega cell to remove it out of the chassis.
24. Loosen the two screws that secure the hard-drive backplane to the front cage, carefully remove the hard-drive
backplane out of the chassis.
25. Loosen the thumbscrew that secure the system board to the chassis.
26. Grasp the system board by the system board handle and slide it toward the front of the server until it stops.
27. Carefully lift the system board out of the chassis.
28. Capacitors > 2.5CM -- Remove the power supply(s) from the system. With #2 Philips screw driver remove the screws
securing the top cover and the heatsinks in the P/S then locate the capacitors and pry from the PCB with a medium flat
head screw driver and dispose of properly.
3.2 Optional Graphic. If the disassembly process is complex, insert a graphic illustration below to identify the items
contained in the product that require selective treatment (with descriptions and arrows identifying locations).
Attachment 1 – System Battery Location. Remove and dispose of properly
Attachment 2- Location of mega cell. Remove and dispose of properly
Attachment 3~9-- Capacitor location by model number of power supply. Remove and dispose of properly