EasyManua.ls Logo

HPE ProLiant ML350 Gen10 - Page 100

HPE ProLiant ML350 Gen10
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9. Remove the fan from fan bay 1.
10. Install the blank in fan bay 1 .
11. Remove the blank from the half-height media bay 1.
12. Install the metal shims on the LTO tape drive.
The shims and the T-15 Torx screws are included in the LTO tape drive option kit.
If you are installing an LTO tape drive that does not include its own mounting screws, use the preinstalled
media drive spare screws.
13. Slide the LTO tape drive into the halfheight media bay 1 until the rear edge of the drive is aligned with
the rear edge of the drive box.
14. Connect the LTO/RDX power extension Y-cable to the LTO tape drive SAS-power Y-cable.
100 Hardware options installation

Table of Contents

Other manuals for HPE ProLiant ML350 Gen10

Related product manuals