EasyManua.ls Logo

HPE ProLiant ML350 Gen9 - Page 167

HPE ProLiant ML350 Gen9
190 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
System battery replacement 167
3.
Install the access panel (on page 33).
4. Do one of the following:
o If the server is in a tower configuration, return the server to an upright position.
o If the server is in a rack configuration, slide the server into the rack.
5. Connect each power cord to the server.
6. Connect each power cord to the power source.
7. Power up the server ("Powering up the server" on page 30).
8. Do one of the following:
o For tower models, install the tower bezel (on page 31).
o For rack models, install the security bezel ("Security bezel option" on page 50).
For more information about battery replacement or proper disposal, contact an authorized reseller or an
authorized service provider.

Table of Contents

Related product manuals