Setup 47
Server
Power cord
Tower feet
Hardware documentation and software products
In addition to the supplied items, you might need:
Hardware options
Operating system or application software
Torx T-15, Philips #2, and flathead screwdriver
Installing hardware options
Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to "Hardware options installation (on page
50)."
Setting up a tower server
Follow the steps in this section to set up a tower model server. To install the server into a rack, see the
rack installation section.
1. Lay the server on the side, and then install the feet.
2. Return the server to an upright position.
3. Connect peripheral devices to the server ("Rear panel components" on page 11).
WARNING:
To reduce the risk of electric shock, fire, or damage to the equipment, do not plug
telephone or telecommunications connectors into RJ-45 connectors.
4. Connect the power cord to the rear of the server.
5. Connect the power cord to the AC power source.