l Air filters installed on cabinet doors.
l AC power supplied from the rear of the cabinet.
4.2 Unpacking the Chassis
Step 1 Check that the packaging is in good condition.
NOTE
If there is damage (for example, if the package is soaked or deformed, or the seals or pressure-sensitive
adhesive tapes are not intact), submit the Cargo Problem Feedback Form.
Step 2
CAUTION
Be careful with the box cutter to avoid personal injury or equipment damage.
Cut open the pressure-sensitive adhesive tape on the package, and open the box.
Step 3 Check the contents against Table 4-2 to ensure that nothing is missing. Check that they are
free from oxidation, corrosion, or damage.
Table 4-2 Shipped items
No.
Description
1 Documentation bag that contains a warranty card, and a Quick Start Guide
2 Guide rails
3 Rack server
----End
4.3 Installing Optional Parts
Before installing and configuring the server, you need to install all optional parts required, for
example, extra CPUs, drives, and PCIe cards. For details, see 5 Optional Part Installation.
4.4 Installing the Server on Guide Rails
4.4.1 Installing with L-Shaped Guide Rails
L-shaped guide rails are designed for Huawei cabinets.
The 2288H V5 servers are stackable when L-shaped guide rails are used.
Step 1 Install the floating nuts.
2288H V5 Server
User Guide
4 Setup
Issue 04 (2018-09-04) Copyright © Huawei Technologies Co., Ltd. 69