4. (Optional) Tighten the captive screws on the mounting ears to secure the server. See
Figure 4-12.
Figure 4-12 Securing the server
Step 3 Install the cable management arm (CMA).
1. Insert the support lever into both left and right outer rails. See (1) in Figure 4-13.
2288H V5 Server
User Guide
4 Setup
Issue 04 (2018-09-04) Copyright © Huawei Technologies Co., Ltd. 78