EasyManua.ls Logo

Huawei BBU3900 V300 - BBU Installation in APM30 H(Ver.B); BBU Case Installation; BBU Cable Connections

Huawei BBU3900 V300
58 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
33
BBU
EPS 01
Installing the BBU in the APM30H(Ver.B)
Installing the BBU Case
a
b
BBU Cable Connections
M6 screws
Slide the BBU into the 2 U space
close to the EPS along the guide rails,
and then tighten the four M6 screws
on the BBU panel.
1. Installing the BBU Case
Monitoring signal cable
Alarm cable
BBU power cable
E1/T1 cable
FE/GE cable
FE/GE surge protection
transfer cable
E1/T1 surge protection
transfer cable
CPRI optical cable
Slide the SLPU box into the 1U space above
the EPS in the cabinet, and then fasten the
two M6 screws on the panel.
2. Installing the SLPU Case
SLPU
2 N•m
M6x16

Related product manuals