EasyManua.ls Logo

Huawei FusionDC1000A - Replacing Cooling System Components; Replacing Components for the Cooling System

Huawei FusionDC1000A
180 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Procedure
Step 1 Switch o the upstream circuit breaker for the power PDB.
Step 2 Power o the power PDB based on the power supply and distribution system
diagram.
Step 3 Remove cables using a socket wrench and Phillips screwdriver.
Step 4 Remove screws securing the power PDB and remove the power PDB.
Step 5 Secure the new power PDB and connect cables correctly.
----End
4.2 Replacing Cooling System Components
4.2.1 Replacing Components for the Cooling System
NO TICE
For details about how to replace components for the cooling system, see the
user manuals for the components.
During smart cooling product parts replacement, the system may need to be
powered
o. Take measures to prevent device overheating.
For details about parts replacement for smart cooling products, see the section
"Parts Replacement" in the smart cooling product user manual.
Table 4-2 Replacing cooling system components
Device
Component Name
NetCol5000-A025 In-row Air Cooled
Smart Cooling Product
Air lter
Indoor fan
Dierential pressure switch
Compressor
Dryer lter
(Optional) Wet lm humidier
(Optional) Humidier cylinder
Electric control box
Temperature and humidity (T/H)
sensor
Module
FusionDC1000A Prefabricated All-in-One Data
Center
Maintenance Guide (IT Scenario) 4 Parts Replacement
Issue 01 (2021-04-20) Copyright © Huawei Technologies Co., Ltd. 57

Table of Contents

Other manuals for Huawei FusionDC1000A

Related product manuals