Field Personnel Skill Requirement
Management
system
With knowledge in the hardware and software of the
prefabricated data center, familiar with basic
communications protocols, familiar with equipment
interfaces in extra-low voltage (ELV) systems, and procient
in operating the NetEco management system
With ELV engineer
qualications
Fire
extinguishing
system
Familiar with the re extinguishing system congurations
and the operations for each core device in the FusionDC1000
With re protection engineer qualications
Lighting and
structural
systems
Familiar with the overall congurations and layout of the
FusionDC1000
Experienced in data center maintenance
3.4 Check Before Power-On
Preparations
Tools: multimeter, screwdriver, step ladder, insulation megohmmeter, pressure
gauge
Documents: solution drawings and parameters
Skill requirement: power distribution engineer
FusionDC1000A Prefabricated All-in-One Data
Center
Commissioning Guide (IT Scenario) 3 Preparations for Power-On Commissioning
Issue 02 (2022-12-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 29