EasyManua.ls Logo

Huawei FusionServer Pro 2288H V5 - Installing L-Shaped Guide Rails

Huawei FusionServer Pro 2288H V5
177 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.2.4.1 Installing L-Shaped Guide Rails
L-shaped guide rails are designed for Huawei cabinets only.
The 2288H V5 servers are stackable onto L-shaped guide rails.
Procedure
Step 1 Install floating nuts.
1. Determine the installation positions of the floating nuts according to the cabinet device
installation plan.
Figure 7-3 Spacing of 1U on a mounting bar of a cabinet
Floating nuts are used to tighten screws.
The boundary between Us is used as the reference for calculating device installation space.
2. Fasten the lower end of a floating nut to the target square hole in a mounting bar at the
front of the cabinet.
3. Use a floating nut hook to pull the upper end of the floating nut, and fasten it to the upper
edge of the square hole.
FusionServer Pro 2288H V5 Server
User Guide
7 Installation and Configuration
Issue 08 (2019-10-30) Copyright © Huawei Technologies Co., Ltd. 77

Table of Contents

Other manuals for Huawei FusionServer Pro 2288H V5

Related product manuals