EasyManua.ls Logo

Huawei FusionServer Pro 2288H V5 - Page 86

Huawei FusionServer Pro 2288H V5
177 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 7-4 Installing a floating nut
4. Install the other floating nut in the same way.
Step 2 Install the L-shaped guide rails.
1. Position a guide rail horizontally in contact with the mounting bars in the cabinet.
2. Tighten the screws to secure the guide rail.
3. Install the other guide rail in the same way.
Figure 7-5 Installing an L-shaped guide rail
----End
FusionServer Pro 2288H V5 Server
User Guide
7 Installation and Configuration
Issue 08 (2019-10-30) Copyright © Huawei Technologies Co., Ltd. 78

Table of Contents

Other manuals for Huawei FusionServer Pro 2288H V5

Related product manuals