Step 2 Remove the server node.
For details, see 8.3.3 Removing an XH321 V5.
Step 3 Place the server node on the ESD workstation.
Step 4 Determine the position of the PCIe riser module.
Step 5 Remove the ller panel.
● Perform this operation only when a ller panel is installed.
● Keep the removed ller panel properly.
FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide 8 Parts Replacement
Issue 17 (2021-03-09) Copyright © Huawei Technologies Co., Ltd. 93