13
Installing a Ground Cable
4.3
No.
Type
Conductor Cross
-
Sectional Area
Range
Outer Diameter
1
Single
-core outdoor
copper
-core cable
10 mm
2
-
2
Common outdoor PV
cable in the industry
4
6 mm
2
5.5
9 mm
3
Outdoor shielded
twisted pair cable (8
cores)
0.20
1 mm
2
6.2
7 mm
Routing Cables Out of the Cable Hole
4.2
Before connecting external cables, route
the cables through the cable hole to avoid
disconnecting after installation.
Prepare cables based on site requirements.
Ground a ground point of the power control module.
Apply silica gel or paint around the ground terminal after the ground cable is connected.
Power control module
Connect cables in accordance with local installation laws and regulations.
The DC input power cable and signal cable between the battery and the inverter must be less
than or equal to 10 m.