No. Test Item Procedure Criteria
2 Main ground
insulation
resistance
after L1, L2,
L3, and N
are short-
circuited
1. Short-circuit L1, L2, L3, and
N.
2. Select the insulation
resistance test function for
the tester. Connect one
end of the tester to the
short-circuit point of the
phase wire and the other
end to the main ground
point. Set the test voltage
to 1 kV DC and record the
test resistance.
The test voltage is 1
kV.
The stable insulation
resistance is greater
than or equal to 1
MΩ.
Note: If the result of the rst test does not meet the requirements, perform the
test again following the prerequisites. If the test result still fails to meet the
requirements, contact the Company's service engineers immediately.
Follow-up Procedure
Remove the short-circuit cable and restore all switches to factory settings.
LUNA2000-2.0MWH Series Smart String ESS
User Manual 11 FAQ
Issue 08 (2022-11-15) Copyright © Huawei Technologies Co., Ltd. 224