EasyManua.ls Logo

Huawei LUNA2000-200KTL-H1 - Page 43

Huawei LUNA2000-200KTL-H1
105 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Method
If the installation position is high and a crane is required, run a sling (strong
enough to bear the weight of the Smart PCS) through the two lifting eyes to hoist
the Smart PCS.
Table 4-2 Method description
Method Tool Description
Manual
handling
Lifting handles Prepared by the
customer
Hoisting
Crane sling
[1]
Prepared by the
customer
Note [1]: The hoisting capability of the crane shall be greater than or equal to 3
t, the working radius shall be greater than or equal to 2 m, and the length of
the lifting sling shall be greater than or equal to 1.8 m. To prevent damage to
the device surfaces, you are advised not to use metal slings such as steel wire
ropes.
Hole Description
(1) Lifting handle screw hole
(2) Mounting bracket screw holes
Procedure
Step 1 Take the device out of the packing case and move it to the specied position.
Figure 4-7 Using the lifting handles
LUNA2000-200KTL-H1 Smart Power Control System
User Manual 4 Installation
Issue 08 (2024-01-23) Copyright © Huawei Technologies Co., Ltd. 36

Table of Contents

Related product manuals