If Smart PCSs are installed on the DCBOX, bind the cables as shown in the
following gure.
Figure 5-23 Binding FE communications cables
----End
5.9 Closing the Maintenance Compartment Door
Precautions
● Before closing a maintenance compartment door, check that the cables are
connected correctly and securely, close the terminal block cover, and remove
any foreign object from the maintenance compartment.
● If a screw on the maintenance compartment door is lost, obtain a spare screw
from the accessory bag in the maintenance compartment.
5.9.1 Closing the DC Maintenance Compartment Door
Step 1 Adjust the support bar, close the maintenance compartment door, and tighten the
two screws on the door.