Huawei LUNA2000-200KWH-2H1 - 1.2 Electrical Safety

Huawei LUNA2000-200KWH-2H1
61 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Name Model/Specications Quantity Remarks
Power
distribution
equipment
(including the
on/o-grid
switch)
Supporting remote signal
feedback
1 Prepared by the
customer
Microgrid
central
controller
(MGCC)
Supporting the IEC 104 or
Modbus TCP communication
protocol
1 Prepared by the
customer
Isolation
transformer
400/400 V, Dyn11, 1.1 times
long-term operation, 50
Hz/60 Hz
1 Prepared by the
customer
IMD DOLD RN5897.12/011, used
with the coupler DOLD
RP5898/61
1 Prepared by the
customer. Do not
connect the
measurement
cable of the IMD
to circuit breakers
or switches to
prevent the
measurement
loop from being
disconnected.
UPS 1–3 kVA, online UPS, 220
V
Power backup duration ≥
1 hour
To ensure reliable power
supply to the UPS, it is
recommended that the
UPS power supply be
provided from either side
of the on/o-grid switch,
whichever side is
available.
1 Prepared by the
customer
1.1.2 O-Grid PV+ESS System
The o-grid PV+ESS system applies to remote areas and islands without electricity.
The ESS and PV system are controlled and coordinated to supply power.
In this system, the ESS is AC-coupled with the PV system through an isolation
transformer. The ESS functions as the main power supply for grid forming, and
also supplies power together with the PV system to loads. When the ESS is
overdischarged, the DG charges the ESS.
Commercial and Industrial Microgrid Energy Storage
Solution
Quick Guide (With Third-Party Microgrid Central
Controller) 1 Solution Introduction
Issue 04 (2023-12-18) Copyright © Huawei Digital Power Technologies Co., Ltd. 5