EasyManua.ls Logo

Huawei LUNA2000-200KWH-2H1 - Page 106

Huawei LUNA2000-200KWH-2H1
171 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Follow-up Procedure
Step 1 Turn on the power switch of the air conditioner in the cabinet.
Step 2 Log in to the CMU, choose Maintenance > Connect Device > Remove Devices,
and remove the old air conditioner.
Figure 8-14 Removing the old air conditioner
Step 3 Click Auto. Search and add the new air conditioner.
Figure 8-15 Adding the new air conditioner
Step 4 Check whether the functions are restored.
Check Item
Criteria
Alarm information No component communication alarm is generated.
Function The functions are normal.
Running data Air conditioner status: normal operation
----End
LUNA2000-200KWH-2H1 Smart String ESS
Maintenance Manual 8 Replacing an Air Conditioner
Issue 02 (2023-02-28) Copyright © Huawei Digital Power Technologies Co., Ltd. 100

Table of Contents

Other manuals for Huawei LUNA2000-200KWH-2H1

Related product manuals