Figure 7-31 Securing the Smart PCS
----End
7.4.5 (Optional) Installing a Maintenance Socket
Context
The 220 V socket is prepared by the customer. The actual socket appearance may
vary. This section describes only the installation method.
Procedure
Step 1 Remove the bae plate in front of the power distribution area.
Step 2 Install the maintenance socket.
Figure 7-32 Installing the socket
----End