● Slowly push or move battery packs to prevent damage and collision.
● To prevent battery packs from falling o, start the pallet truck or forklift
after conrming that battery packs are securely bound.
● Before installation, ensure that battery packs are stored indoors and that
other storage requirements specied in the user manual are met.
● Before installation, check the status of the battery packs. Do not use the
battery packs if the packing cases are exposed to rain, damaged, or
deformed, or if the battery packs leak or fall.
● Install batteries within 24 hours after unpacking. If the batteries cannot be
installed in time, place them in a dry indoor environment without corrosive
gases. Power on the ESS within 24 hours after installation. The process
from unpacking batteries to powering on the system must be completed
within 72 hours. During routine maintenance, ensure that the
power-o
time does not exceed 24 hours.
● Do not install battery packs on rainy, snowy, or foggy days. Otherwise, the
battery packs may be eroded by moisture or rain.
Procedure
Step 1 Remove the column in the middle.
LUNA2000-200KWH-2H1 Smart String ESS
User Manual 7 Installation
Issue 03 (2023-03-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 86