2 switch 2FCB7, air conditioner 1 switch 2FCB8, and air conditioner 2 switch
2FCB9 in sequence.
Use a multimeter to check that the output voltage at position 1 in the preceding
gure is 53 V±5 V.
Step 7 Turn on the DC switch 1Q2. (As shown by 8 in Figure 9-2)
----End
LUNA2000-(97KWH-1H1, 129KWH-2H1,
161KWH-2H1, 200KWH-2H1) Smart String ESS
User Manual 9 Powering On the ESS
Issue 10 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd. 132