35
Installing E1 cables - OptiX OSN 9560 and OptiX OSN 7500
b
Installing E1 cables - overhead cabling
Installing E1 cables cabling from the floor
Run the E1 cables into the cabinet through cable holes at
the top of the cabinet.
Connect the E1 cables to the ports on the interface board
and tighten captive screws for the cable connectors.
If an OptiX OSN 9560 and an OptiX OSN 7500 are
installed in the same cabinet, the cable distribution plate
must be removed to make sufficient space for the OptiX
OSN 7500.
Run the E1 cables into the cabinet through cable holes at the bottom of
the cabinet.
Connect the E1 cables to the ports on the interface board and tighten
captive screws for the cable connectors.
Cable hole
E1 cable
E1 cable
If an OptiX OSN 9560 and an OptiX OSN 7500 are installed in the
same cabinet, the cable distribution plate must be removed to make
sufficient space for the OptiX OSN 7500.
NOTE