ventilation area of the system is calculated based on the number of modules.
(The data is the heat dissipation area required for the charging module only.)
It is recommended that the space reserved at the air intake vent and exhaust
vent of the charging module be at least 40 mm and 85 mm respectively. The
actual space depends on the system air channel.
The installation environment must meet the environmental
specications. For
details, see "Technical Specications."
4.3 Installing a Charging Module
Installation Clearances
Figure 4-2 Installation clearances (unit: mm)
Installation Procedure
CA UTION
Do not keep the installed charging module in the standby or power-o state for
an extended period.
NO TE
Ensure that all the mounting holes on the panel are secured by screws.
Ensure that the nixie tubes are on the left side of the charging module during horizontal
mounting. Ensure that the nixie tubes are on the upper side of the charging module
during side mounting.
The charging module supports horizontal-mounting and side-mounting installation.
Select the installation mode based on the actual situation. The horizontal-mounting
installation mode is recommended.
Step 1 Slowly push the charging module into the slot.
R100030G1 Charging Module
User Manual 4 Installation
Issue 05 (2021-11-16) Copyright © Huawei Digital Power Technologies Co., Ltd. 25

Related product manuals