downward into the CPU socket by avoiding touching the securing rods. See (1) in
Figure 7-86.
Ensure that the CPU is properly installed. Figure 7-87 shows a CPU that is
incorrectly placed.
Figure 7-86 Installing a CPU
Figure 7-87 Incorrectly placed CPU
Step 13 Close the load plate to secure the CPU. See (2) in Figure 7-86.
Step 14 Lower the securing rod near the or label. See (3) in Figure 7-86.
Step 15 Lower the securing rod near the
or label. See (4) in Figure 7-86.
Step 16 Align the screws on the heat sink with the fastening studs on the CPU base, and
place the heat sink on the CPU. See (1) in Figure 7-88.
Figure 7-88 shows the heat sink installation.
RH2288H V3 Server
User Guide 7 Replacing Parts
Issue 46 (2022-12-28) Copyright © Huawei Technologies Co., Ltd. 225