3 Installing and Removing the RH2288H
V3
About This Chapter
This section describes the precautions and procedures for installing and removing
the RH2288H V3.
3.1 Installation Overview
3.2 Installation Environment
3.3 Unpacking the Chassis
3.4 Installing the Server
3.5 Connecting External Cables
3.6 Removing the Server
3.1 Installation Overview
For details about the safety instructions during the process of installing or replacing a
server or its parts, see "Safety" in the
Rack Server Product Documentation
.
Installation Guidelines
The RH2288H V3 is 2U high and ts into a standard 19-inch cabinet. The server
can be installed on L-shaped, adjustable, and holding rails, and is stackable. If the
cabinet has
sucient space, a distance of 1U or more can be reserved between
servers.
Installation Process
Before installing the RH2288H V3, view the overall server installation process.
Figure 3-1 shows the process for installing the RH2288H V3.
RH2288H V3 Server
User Guide 3 Installing and Removing the RH2288H V3
Issue 46 (2022-12-28) Copyright © Huawei Technologies Co., Ltd. 80