EasyManua.ls Logo

Huawei RH8100 V3 - Page 153

Huawei RH8100 V3
386 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
You have obtained the cabinet number and chassis number of the RH8100 V3.
You have located the RH8100 V3 based on the preceding information, and
labeled its panel to prevent misoperations.
You have determined the position on the RH8100 V3 for installing an
indicator board.
Tools
ESD gloves
Packaging materials, for example, an ESD bag
Hardware
Spare indicator board
Procedure
Step 1 Wear an ESD wrist strap or ESD gloves. For details, see 1 Safety Instructions.
Step 2 Take the spare indicator board out of its ESD bag.
Step 3 Connect all cables to the indicator board. See step (1) in Figure 5-29.
Step 4 Install the indicator board in the mounting ear. See step (2) in Figure 5-29.
Figure 5-29 Installing an indicator board
RH8100 V3 Server
User Guide 5 Removing and Installing Parts of the RH8100 V3
Issue 30 (2019-12-19) Copyright © Huawei Technologies Co., Ltd. 143

Table of Contents

Related product manuals