● You have obtained the cabinet number and chassis number of the RH8100 V3.
● You have located the RH8100 V3 based on the preceding information, and
labeled its panel to prevent misoperations.
● You have determined the position on the RH8100 V3 for installing an
indicator board.
Tools
● ESD gloves
● Packaging materials, for example, an ESD bag
Hardware
Spare indicator board
Procedure
Step 1 Wear an ESD wrist strap or ESD gloves. For details, see 1 Safety Instructions.
Step 2 Take the spare indicator board out of its ESD bag.
Step 3 Connect all cables to the indicator board. See step (1) in Figure 5-29.
Step 4 Install the indicator board in the mounting ear. See step (2) in Figure 5-29.
Figure 5-29 Installing an indicator board
RH8100 V3 Server
User Guide 5 Removing and Installing Parts of the RH8100 V3
Issue 30 (2019-12-19) Copyright © Huawei Technologies Co., Ltd. 143