EasyManua.ls Logo

Huawei RRU3971 - Page 111

Huawei RRU3971
134 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NOTICE
On AC-powered electric railways, such as high-speed railways, when leaky cables are connected
to RRUs installed in tunnels, high-voltage-resistance DC blocks must be installed between RRU
RF jumpers and the leaky cables to protect the RRUs against damage.
Step 2 Connect the other end of the RF jumper to the external antenna system.
Step 3 Waterproof the connectors of the RF jumper by referring to Figure 8-17.
Figure 8-17 Waterproofing a connector of the RF jumper
(1) Waterproof tape
(2) PVC insulation tape
NOTE
l Before wrapping waterproof tape, stretch the tape evenly until the length of the tape becomes twice its
original length.
l Do not stretch the PVC insulation tape when wrapping the PVC insulation tape.
l Wrap each layer of tape around the connector tightly and neatly, and ensure that each layer of tape overlaps
more than 50% of the preceding layer. Ensure that neighboring layers are stuck to each other.
l Ensure that the adhesive surface of the tape overlaps the lower layer.
l When cutting off the cable ties, reserve a redundant length of 3 mm (0.12 in.) to 5 mm (0.2 in.).
1. Wrap three layers of waterproof tape on the connector, first from bottom up, then from top
down, and finally from bottom up. Start wrapping the connector at a position 50 mm (1.97
in.) away below the bottom of the connector to the top of the connector, first from bottom
8 Installing RRU Cables
Issue () Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
102

Table of Contents

Related product manuals