Figure 6-1 Binding mounting kits for the RRU
(1) Lifting sling (2) Traction sling
Step 3 Technician A catches the mounting kits and then unties the slings.
Step 4 Install the mounting kits. For detailed operations, see steps 1 to 3 in 7.2.1 Installing a Single
RRU.
Step 5 Technician C binds the RRU using the lifting sling and traction sling, as shown in Figure 6-2.
The binding methods in Figure 6-3 and Figure 6-4 are incorrect.
6 Hoisting an RRU and Related Cables onto a Tower
Issue () Huawei Proprietary and Confidential