EasyManua.ls Logo

Huawei SUN2000-10KTL-M2 - Page 51

Huawei SUN2000-10KTL-M2
136 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Procedure
Step 1 Crimp the OT terminal.
NO TICE
Pay attention not to damage the core wire when stripping a cable.
The cavity formed after crimping the conductor strip of the OT terminal needs
to wrap the core wire completely. The core wire needs to contact the OT
terminal closely.
Wrap the wire crimping area with the heat shrink tubing or the PVC insulation
tape. The following
gure uses the heat shrink tubing as an example.
When using the heat gun, protect devices from being scorched.
Figure 5-2 Crimping an OT terminal
(1) Cable (2) Core wire (3) Heat shrink tubing
(4) OT terminal (5) Crimping tool (6) Heat gun
Step 2 Connect the PE cable.
SUN2000-(8KTL-20KTL)-M2
User Manual 5 Electrical Connections
Issue 11 (2023-02-07) Copyright © Huawei Technologies Co., Ltd. 43

Table of Contents

Related product manuals