EasyManua.ls Logo

Huawei TaiShan 200 2280 - Page 101

Huawei TaiShan 200 2280
209 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 5-22 Installing a PSU ller
----End
Installing an AC PSU
NO TICE
PSUs on the same server must be of the same model.
Use dedicated power cables to ensure equipment and personal safety.
Power cables are used only for dedicated servers. Do not use them for other
devices.
Connect power cables of active and standby PSUs to
dierent power
distribution units (PDUs) to ensure reliable system operating.
Ground equipment before powering it on. Otherwise, high leakage current may
cause equipment damage.
Step 1 Wear an ESD wrist strap. For details, see 5.2 ESD Protection.
Step 2 Remove the PSU ller. See Figure 5-23.
TaiShan 200 Server
Maintenance and Service Guide (Model 2280) 5 Removal and Installation
Issue 04 (2020-01-16) Copyright © Huawei Technologies Co., Ltd. 94

Table of Contents

Related product manuals