EasyManua.ls Logo

Huawei TaiShan 200 2280 - Page 143

Huawei TaiShan 200 2280
209 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 5-75 Installing a ller panel
----End
Installing a FlexIO Card
Step 1 Wear an ESD wrist strap. For details, see 5.2 ESD Protection.
Step 2 Power o the server. For details, see 5.4.2 Powering O the Server.
Step 3 Remove the power cables. For details, see 5.7 PSU.
Step 4 Remove the server. For details, see 5.4.4 Removing the Server and Guide Rails.
Step 5 Remove the
ller panel. See Figure 5-76.
TaiShan 200 Server
Maintenance and Service Guide (Model 2280) 5 Removal and Installation
Issue 04 (2020-01-16) Copyright © Huawei Technologies Co., Ltd. 136

Table of Contents

Related product manuals