Rack-Mounted Installation
NO TE
Reserve 1 U space in the middle of four batteries for routing battery power cables.
Reserve 50 mm space between the battery communications port and the cabinet for
installing communications cables.
Reserve 44 mm space between the battery edge and the rack edge for installing battery
power cables.
In rack-mounted installation scenarios, the front panels of the UPS and lithium batteries
are not on the same plane.
The guide rails for the UPS2000-6KRTLL are 592.37–807.37 mm long, 30 mm wide, and
87 mm high. The guide rails are scalable and support Huawei M-shaped cabinets.
1. Install the mounting ears on both sides of the UPS.
2. Install the guide rails on the rack, and then install the UPS and batteries with
mounting ears on the rack.
Figure 3-2 Rack-mounted installation (two UPSs and four lithium batteries)
UPS2000-G-6KRTLL
User Manual 3 Installation
Issue 02 (2022-06-30) Copyright © Huawei Technologies Co., Ltd. 25