v 1.0 — August 2018 Altanium Neo5
Page 131
Chapter 15 Maintenance
This chapter describes the maintenance tasks required to maintain the Neo5. Do the
maintenance tasks only when necessary.
Periodically, and before starting the equipment, check that all cables and cable connections
are free from wear or damage. Do not operate equipment if the cables are damaged. Replace
all the cables that appear damaged.
Procedure Reference
Replacing an Intelligent Control Card Section 15.3.1
Replacing a Blown Fuse on an Intelligent Control Card Section 15.3.2
Removing and Replacing the Touch Monitor — Integrated Configuration Section 15.4.1
Removing and Replacing the Touch Monitor — Freestanding Configuration Section 15.4.3
Removing and Replacing the MCU — Integrated Configuration Section 15.4.2
Removing and Replacing the MCU — Freestanding Configuration Section 15.4.4
Removing and Replacing the Operator Interface — Freestanding
Configuration
Section 15.4.5
Cleaning the System Section 15.6
Basic Troubleshooting Section 15.7