P a g e 20 | 38
The related control must be mounted on a wall or a rigid surface. It shall be mounted on eye level and
next to the reactor, within the reach of cables provided. A permanent power connection via a
switchable fused spur (230V/1pH/50Hz; 5A) must be provided in close vicinity to the system.
ATTENTION:
Electrical connections must only be done by an authorised expert according to VDE
requirements! All works must be done only by authorised and instructed experts.