P a g e 33 | 38
Appendices 3:
Start-up and Instruction Record
HydroWELL
®
System size / Serial number: _________________________________________________
Customer: _________________________________________________
◼ Correct installation: yes no
◼ Isolation valves provided on both sides: (for Service) yes no
◼ Are the connections water tight? yes no
◼ Electrical installation correct: yes no
◼ Mains voltage is applied: yes no
◼ Normal function of system: yes no
◼ Display functions working: yes no
◼ Test fault report working: yes no
◼ Transmission: ____________________ %
◼ Flow rate: ____________________ m³/h
◼ Calibration of system done: yes no
◼ Notes: _________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
The operator was instructed in the machine operation. The required operation and maintenance manual was handed over. It
was stated that despite a careful design and installation mains water of drinking water quality will only be available at all
times when regular water use and unit maintenance are provided in all areas of installation and at all times.
Site/Date: ____________________________________________________________________
Customer: __________________________ Supplier: ___________________________