P a g e 5 | 38
NOTE!
A Hydrotec technician will make all
connections between the control box
and reactor and supply UV lamps when
the system is commissioned. If the unit
is to be connected to a BMS panel, this
is the responsibility of the BMS
installation technician. Connections to
BMS can be found within this manual in
the wiring diagram.
The control box is to be mounted within
the reach of cables the unit was
provided with! Under no circumstances
it is allowed to modify the cables in any
way!