Figure 115. Replacing the air baffle
Preparing the system for operation after removing and replacing the system backplane
Follow these steps to prepare the system for operation after removing and replacing the system
backplane.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Slide the service access cover (A) onto the system unit.
3. Close the release latch (B) by pushing it in the direction shown.
Removing and replacing the system backplane in the 5105-22E, 9008-22L, 9009-22A, 9009-22G, 9223-22H,
or 9223-22S 115

Other manuals for IBM 5105-22E

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM 5105-22E and is the answer not in the manual?

IBM 5105-22E Specifications

General IconGeneral
BrandIBM
Model5105-22E
CategoryPower Supply
LanguageEnglish

Related product manuals