EasyManua.ls Logo

IDEAL MINI C24 - Page 33

IDEAL MINI C24
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SERVICING
Mini Installation & Servicing
33
4 0 R E --- A S S E M B LY
Re --- assemble the boiler in the following order:
3 Refit the burner.
4 Reconnect the electrodes to the electronic pcb. See frame
37 for correct connectors.
5 Refit the combustion chamber panel.
6 Refittheinnercasecover.
IMPORTANT. Ensure the boiler sealing panel is correctly
fitted and that a good seal is made.
7 Refittheboilersideandfrontpanels.
8 Turn on the gas supply at the gas service cock.
9 Reconnect the electrical supply.
41 FAN AND VENTURI REMOVAL AND
CLEANING
1 Disconnect the electrical supply.
2 Remove outer and inner casing.
3 Disconnect the connectors A and the earth connection B.
A
B
4 Disconnect the pipe which connects the venturi device to
the air pressure switch.
5 Unscrew the screws C and remove the clamp D.
C
D
F
If the right clearance is at least 50 cm (20”)....
6 Unscrew the 3 sc rews E and remove the fan and skip to
step 9
E E
F
If the right clearance is less than 50 cm (20”)....
6 Remove the combustion chamber panel (see frame 36)
7 Remove the 3 screws F and remove the flue hood with the
fan.
8 Unscrew the 3 screws E and remove the fan.
9 Check that the impeller runs freely. Clean with a soft brush
or renew as necessary. Refer to frame 52 for replacement.
Note: Always take care when handling the fan, in order to
preserve the balance of the impeller.
10 Check the venturi G for cl eaness.
G
11 Re --- assemble in reverse order.
To correctly connect the venturi device to the air pressure
switch, refer to the following illustration.
--- +
SERVICING

Other manuals for IDEAL MINI C24

Related product manuals