EasyManua.ls Logo

Infortrend EonStor DS 1012 - Slide Rail Kit Installation; Installation Prerequisites and Procedures

Infortrend EonStor DS 1012
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
138
Slide Rail Kit Installation Guide
The table is categorized into model numbers in alphabetical / numeric order so users
can fast locate the corresponding slide rail kit for their respective enclosure.
Slide Rail Kits
If you are unable to locate clear instructions on installing your enclosure, please
contact Technical Support!
Enclosure Installation Prerequisites
To ensure proper installation and functionality of the RAID system, please observe the
following warnings:
Cross check all components have been received against the “Unpacking List”. Contact
your vendor immediately if anything is missing
Install the enclosure as-is out of the packaging; install hard drives and optional
modules (FBM / Supercapacitor battery) after the enclosure has been mounted
Wear an anti-static wristband before and during the installation procedure
It is recommended to plug the system into two different power sources (eg. into a
power outlet and another into a UPS)
Ensure the rack which the enclosure will be mounted onto has proper grounding and
over-current protection
Do not obstruct ventilation openings; provide 20cm of free space at the front and back
of the enclosure for air circulation; keep the ambient temperature below 35 degrees
Celsius

Table of Contents

Related product manuals