EasyManua.ls Logo

Infortrend EonStor DS 1012 - Battery Backup Unit Installation

Infortrend EonStor DS 1012
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
42
Battery Backup Unit Installation
1. With the controller removed, remove the cover by removing the two screws show
in the illustration below
2. Hold the battery cage at a 45 degree angle, make sure the cage sits and meets
the screw holes. Secure using the supplied flathead screws.

Table of Contents

Related product manuals