EonStor / EonStor DS S12/S16/S24 Series
31
Power Connections
O drives have be y installed and or nt
interfaces have been connected, the system can be powered on.
131
Checklist
BEFORE powering on the system, please check the following:
CBM: Make sure the CBM has been properly installed before
powering-on the system.
Hard drives: Hard drives are correctly installed in the drive trays.
Drive trays: All the drive trays, whether or not they contain a hard drive,
have been installed into the system.
ost
or external networking devices.
nding temperature.
nce all hard en properl the I/O ports manageme
Cable co
nnections: The system has been correctly connected to h
computer(s), management computers,
Ambient temperature: All system components have been acclimated
to the surrou
NOTE
Make sur se the power cables d that are at least 1.2 meters in length. e you u provide
DO NOT use extension cables as the power cables are designed to connect ONLY
and DIRE relocatable power t s (RPTs) on server cabinets. CTLY to ap
112