Enclosure Replacement Procedure
The following steps describe the enclosure replacement procedure:
1. In extreme rare instances, if there are obvious damages to the enclosure
d
e of the same model!)
onfigurations in XML format
(please refer to Replacing System Configurations in the SANWatch User
Manual). If you choose to manually set all settings, you may skip this step.
5. Power off the system (refer to Power Off Procedure
exposing circuits inside, go to Step 3. When you suspect the backplane boar
is faulty, perform the simple differential diagnosis test mentioned above.
2. Record your differential diagnosis findings, share and consult with Technical
Support Staff
3. Once confirmed with Technical Support staff that it is a new enclosure you need,
please order the exact same model’s enclosure (Important: same model
enclosure backplane board will have the same embedded license number so it
is essential for you to order an enclosur
4. Upon receiving the replacement enclosure, if you want to restore your previous
system settings automatically (provided that your system is still operable), you
will have to export and save a set of system c
), disconnect all cables and
remove all modules from the existing enclosure.
6. Remove the existing enclosure from your rack and install the new enclosure
onto the rack.
7. Reinsert all modules removed into the new enclosure and reconnect all cables
8. Power on the system and confirm module statuses by checking all status LEDs
(please refer to Power On Status Check
).
9. Once booted into the system, load SANWatch, click on Storage Manager icon
or select the Tools > Storage Manager menu and it should show your storage
pool status as “Online”.