Step 21:
Screw in the three screws holding the boiler body to the frame and replace
the boilers caps and steam covers. (See Figure 5)
Step 22:
Reattach the front generator and connecting piping. (See Figure 4)
Step 23:
Reattach the detail piping loosened from the locomotive boiler. Details will
need to be reattached on each side. (See Figure 3)
Step 24:
Reattach the grab irons to the cab doors, along witggh the connecting grab
irons on the back of the cab. (See Figure 2)
Step 25:
Replace the screws holding the cab in place. Reinstall the coupler into the
pilot. (See Figure 1)
At this point you have completed the replacement of the gear box assembly. Test
run you locomotive to validate that everything works as desired.