. 440 01 4541 00 4/2/19
INSTALLATION INSTRUCTIONS
Single--Stage, 35--in. (889 mm) Tall
High Efficiency Condensing Gas Furnace
N92ESN
(Series A)
NOTE: Read the entire instruction manual before starting the installation.
SECTIONS
SAFETY CONSIDERATIONS 3.........................
INTRODUCTION 4...................................
CODES AND STANDARDS 4...........................
ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS 5...
ACCESSORIES 5.....................................
LOCATION 7........................................
AIR FOR COMBUSTION AND VENTILATION 9..........
CONDENSATE TRAP 12...............................
CONDENSATE DRAIN 17.............................
INSTALLATION 21...................................
AIR DUCTS 31.......................................
GAS PIPING 33......................................
ELECTRICAL CONNECTIONS 34.......................
VENTING 40........................................
START --UP, ADJUSTMENT, AND SAFETY CHECK 64......
SERVICE AND MAINTENANCE PROCEDURES 74........
SEQUENCE OF OPERATION 82........................
PARTS REPLACEMENT GUIDE 86......................
Use of the AHRI Certified TM Mark indicates a
manufacturer’s participation in the program.
For verification of certification for individual
products, go to www.ahridirectory.org .
Portions of the text and tables are reprinted from current edition of
NFPA 54/ANSI Z223.1, with permission of National Fire
Protection Association, Quincy, MA 02269 and American Gas
Association, Washington DC 20001. This reprinted material is not
the complete and official position of the NFPA or ANSI on the
referenced subject, which is represented only by the standard in its
entirety.
TABLES
Loose Parts Bag 4.....................................
Minimum Clearances to Combustible Materials 8.............
Minimum Free Area Required 11.........................
Minimum Space Volumes 11.............................
Filter Size Information 27...............................
Opening Dimensions 30................................
Air Delivery CFM 32...................................
Maximum Capacity of Pipe 34...........................
Electrical Data 38......................................
Vent Termination Kit for Direct Vent (2--Pipe) System 42.......
Hangar Spacing 49.....................................
Combustion--Air Vent Pipe, Fitting & Cement Material.. 51.....
Maximum Allowable Exposed Vent Lengths Insulation 52......
Maximum Equivalent Vent Length 53......................
Deductions from Maximum Equivalent Vent Length 53........
Blower Off Delay Setup Switch 68........................
Altitude Derate Multiplier for U.S.A. 69....................
Gas Rate 71..........................................
Orifice Size and Manifold Pressure 72.....................