EasyManua.ls Logo

Isuzu 20LE - Installation

Isuzu 20LE
510 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6B-8 ENGINE COOLING
Play or abnormal noise in the bearing
Cracks or corrosion in the impeller
Installation
1. Before installing water pump, coat sealing surface with
silicon grease.
2. Install water pump assembly and tighten bolts to the
specified torque.
Torque: 25 Nm (2.5 kgf.m)
3. Timing belt
Install timing belt, refer to timing belt installation step in
"Timing Belt" in this manual.
4. Connect radiator hose and replenish EC.
5. Connect battery ground cable.

Table of Contents

Related product manuals