EasyManua.ls Logo

Isuzu AA-6HK1T - Page 59

Isuzu AA-6HK1T
242 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6A–8 ENGINE MECHANICAL
4. IInstall the injection pipes and tighten the steeve nuts
to the specified torque.
Torque: 29 N·m (3.0 kgm/22 lbft)
5. Install the fuel pipe and tighten the bolts to the
specified torque as follows.
Torque:
Fuel return pipe: 37 N·m (3.2 kgm/23 lbft)
Fuel pipe (Fuel filter to Injection pump):
39 N·m (4.0 kgm/29 lbft)
Fuel pipe (Feed pump to fuel filter):
39 N·m (4.0 kgm/29 lbft)
6. Install the fuel leak off pipe (1) with new gasket.
Tighten the eye bolts to the specified torque.
Torque:
Cylinder head side: 29 N·m (3.0 kgm/22 lbft)
Fuel filter side: 25 N·m (2.5 kgm/18 lbft)
1
041EY00015
040EY00009
041EY00011

Table of Contents

Related product manuals