EasyManua.ls Logo

Isuzu c223 turbo - Servicing

Isuzu c223 turbo
35 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GENERAL INFORMATION
1
_9
'i€ffi3:434':):
-ffi-rio=a
ffi
CYLINDER
HEAD
INJECTION
TIMING
SERVICING
Tighten
the
cylinder head bolts
in
sequence as shown
in
the
f igure.
Torque
Tighten
the
cylinder
head
bolts
to the
specified angle
in
sequence above.
Angle
Apply
bisulfide molybdenum
grease
to thread
and contact sur-
face when
using used bolt.
(See
the
illustrationl.
Turn
the crankshaft in
normal
direction of
rotation,
and take
the
reading
of the
dial
indicator when
the timing mark on
the
crankshaft
pulley
is in
alignment
with
the
pointer.
(mm)
0.5
@
t
st step
(snug
torque)
I
I
(t
6o
(for
gear
drive)
1Oo
(for
belt drive)
Standard reading

Related product manuals