EasyManua.ls Logo

ITE 5HK75 User Manual

Default Icon
8 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image

 


    
     
    
www . ElectricalPartManuals . com
Question and Answer IconNeed help?

Do you have a question about the ITE 5HK75 and is the answer not in the manual?

ITE 5HK75 Specifications

General IconGeneral
BrandITE
Model5HK75
CategoryCircuit breakers
LanguageEnglish

Summary

Circuit Breaker Installation

General Installation Procedure

Procedure for installing the circuit breaker into the switchboard, including safety precautions and initial steps.

Installation Inspection

Inspect circuit breaker arc chutes, contacts, and electrical connections for proper condition.

Manual Slow Close for Contact Pressure

Procedure to check contact pressure by manually closing the breaker slowly.

Installing Arc Chutes

Steps for positioning and securing the arc chute onto its pivot pin.

Removing Barrier

Instructions for removing the front barrier by unscrewing and lifting.

Removing Arc Chutes

Steps to disconnect the return connection bar and remove arc chutes.

Arc Chute Examination

Carefully examine arc chutes for breakage, particles, and exterior damage.

Arc Chute Cleaning

Essential steps for cleaning metal and insulated parts of arc chutes.

Installing Barrier

Procedure for installing the barrier, ensuring proper positioning and securing.

Installing Circuit Breaker into Compartment

Steps to rack the circuit breaker into the compartment to disconnect or test position.

Circuit Breaker Operation and Maintenance

Manual Closing Operation

Observe breaker conditions and manually charge/close springs from a safe distance.

Circuit Breaker Removal

Steps to remove the circuit breaker from the compartment after tripping.

Maintenance Recommendations

Recommendations for a maintenance program, inspections, and checks after faults.

Contact Pressure Adjustment

Procedure to adjust stationary main contact deflection and arcing contact touch.

Bridge Pivot Pressure Adjustment

Steps to adjust bridge pivot pressure by loosening and tightening a set screw.

Operating Mechanism Adjustment

Notes on operating mechanism adjustment, only if breaker fails to close electrically.

Racking Mechanism Adjustments

Latch Check Switch Adjustment

Adjust latch check switch for proper breaker closing after trip latch reset.

Racking Mechanism Regulation

Adjust connecting rod length for proper clearance in the racking mechanism.

Electrical Operating Sequence and Renewal Parts

Electrical Operating Sequence

Refer to specific schematic diagrams for operational information.

Renewal Parts Ordering

Recommendations for stocking and ordering renewal parts with part details.

Related product manuals