4.2 Electrical Installation
Electrical installation may be done in conjunction with mechanical installation or separately, but both
installations must be completed before the system is commissioned (Section 5). Wiring must be installed in
accordance with the guidelines of NFPA 70 - National Electrical Code, NEMA, and local electrical codes.
Early warning detection, audible and visible alarm device, and control panels must be installed and tested
in accordance with NFPA 70 - National Electrical Code and NFPA 72 - National Fire Alarm Code as well
as local electrical codes.
Figure 4.1.6.4 Alternate Pilot Actuation Line Conguration – Two-Sided Pilot Actuation Line
(Mv Series Shown. Same for all Series)
Vent Check
(P/N 10173)
Vent Check
(P/N 10173)
NPT Style Pilot
Actuation Check Valve
(P/N 10262)
Pilot Actuation Adapter
(P/N 18624)
Sv Series Only
Primary
Cylinder
Slave
Cylinder
Slave
Cylinder
Slave
Cylinder
Slave
Cylinder
Flex Hose
(See Figures 4.1.6.1a, 4.1.6.1b, and 4.1.6.1c for
appropriate size and P/N for each size cylinder)
Male NPT
Adapter
(P/N 18625)
Male NPT
Adapter
(P/N 18625)
1/4" (8 mm) FNPT x
FNPT Coupling
(P/N 99686)
NPT Pilot Actuation Check
Valve Adapter Hex Nipple
(Sv Series: P/N 18713)
(Mv and Lv Series: P/N 19192)
Pilot Actuation
End Line Tee
(P/N 18611)
100 ft (30.48 m) maximum distance
(including rise and fall)
100 ft (30.48 m) maximum distance
(including rise and fall)
Pilot Actuation
End Line Tee
(P/N 18611)
Pilot Actuation
Mid Line Tee
(P/N 18622)
Pilot Actuation
Mid Line Tee
(P/N 18622)
Section 4 System Installation